One of the selling points of any university during the UCAS admissions process was always whether or not they took part in constructionarium, a field course providing students with hands on construction experience over a period of a week, their aim is to "turn theory into practice". Hence Leeds was a big contender, I was later thrilled to discover it was alongside a couple of reports counted as a 10 credit third year module, despite my acceptance to study abroad next year I still wanted to do constructionarium.

This year Leeds invited Shepherd Construction to join us, a contractor who recently completed the new Leeds University Laidlaw library alongside many other prominent projects in the North, they were asked to get involved in several roles; providing us with guidance, a client figure and more of a professional workplace scenario. 

Prior to departure for the fieldcourse we had two meetings with Shepherd; the first a workshop introducing Shepherd and the pre-site process that takes place followed by a later review session to assess how far we had come in terms of documentation such as method statements and risk assessments whilst also allowing us to meet and familiarise ourselves with the project manager allocated to each team by Shepherd. Having a Shepherd project manager per team gave us a "first point of call" and made us feel more at ease when making big decisions that would affect the project. 

Constructionarium itself is based at the CITB construction college at Bircham Newton in Norfolk (where the canteen food was another selling point as we'd previously visited CITB for a surveying course...) with a large construction site where scaled down versions of famous buildings and infrastructure can be reproduced. The 3 that Leeds University had opted to create this year were the Gherkin; 30 St Mary's Axe in London, Ravenspurn Oil Rig; an oil rig in the Humber estuary, and Brewery Wharf Bridge; a footbridge in Leeds. Obviously I wanted to be on the bridge project as this would be my first chance at constructing a real bridge not made from cake. This was the first year that project preferences could be stated and hence there was a good split and interest for all as each project had really interesting key elements. 

On the first evening we walked up to the site to look through the gate at the areas where we would be working alongside our site cabins, this was then followed by a first evening meeting where the format was explained and there was then time to print and sign off method statements and risk assessments for work to begin the next day. 

Within each of the 3 teams of 18 people each, we selected a role to carry out such as planner, site engineer, safety manager, quality assurance, setting out engineer, different foremen, power tool operators, each with a key role in the project, I was project manager and so was responsible for overseeing the project, ensuring things were running to schedule and delegating tasks efficiently and effectively within the team. This was such an enjoyable role as it was my first chance to actually lead a team and was able to liaise with the client ensuring that each of the tasks were carried out to a high standard by the team. If there were any issues or queries I was who they should go to for me to decide how to respond/ progress. 

There were a really good key set of people who were really enthusiastic and helpful in the pre - site sessions making sure that all of our documentation would be suitable, meaning work could start first thing on the Monday. 

Monday began with an 8am start on site which included a project managers huddle with members of shepherd to discuss materials, plant, concrete deliveries alongside runnings of the site. Relevant information was then relayed to the rest of the group in separate team huddles, discussing our plan of action for the day. These morning huddles were repeated each day to get an understanding of site structure and to organise deliveries to site alongside plant so that each group could be efficient as possible planning their timings including the crucial concrete deliveries - the main targets for the day. 

The bridge that we built was created out of 3 pre cast concrete elements; the a frame and 2 bridge decks that were all formed in our preparation / set down yard. The main tasks for Monday were to create two temporary timber platforms to later cast the pre cast elements on. Following this we made all of the form work for both the a frame and deck sections. 

A key milestone in the programme was a big pour of all of the pre cast elements on the second day, Tuesday of which the constructionarium guys expressed concern at, I was persistent and encouraged the team to get involved and we managed all of the rebar for one leg of the a frame in under an hour, this speed with precision continued for the rest of the day. I spent the first hour of the day running between different people convincing them that we could have our elements ready for a 3pm pour, something that is not normally done (usually just the a frame and big deck section are poured) to us it made sense all at once to ensure we achieved enough strength for lifting on Thursday / Friday. After much convincing the pour was allowed to go ahead with a very productive and tight day but the team were driven, we knew it had to get done. Once it was poured it was an immensely satisfying feeling as there was a rumour that this was the first time all 3 elements had been poured together. The team really pulled together and was a real demonstration of good teamwork.


Wednesday was meant to be the big day for foundations however once we'd learnt the timescales of how long it takes to make and secure form work alongside fixing rebar, the foundations were split over 2 days. The adapted schedule required an extra concrete pour which was scheduled with the Ravenspurn pour. Our foundations were huge masses of concrete with the far footing, foundation 3 requiring 7m3 of concrete plus a ground bearing slab. This foundation was poured on Thursday and required lots of extra propping and securing in terms of the timber form work. Apparently in the past this foundation had blown, which would have obviously been a major set back. 

Throughout the entire construction process lots of care and consideration was taken to consider health and safety aspects especially concerning nails in timber, which one group dully carried out. Shepherd introduced us to their "stop and go" cards that are used out on site used to flag up and praise site behaviour, this became a favourite of our H&S manager making safety more fun and everyone became more aware of it. This was heavily encouraged by Shepherd and was discussed as part of the evening meetings, near misses were also repeated and we were informed of anything that had occurred with other groups so we could avoid this. 

Friday was a key day as on our bridge site all that was visible were the 3 concrete foundations however on Friday the 3 precast elements were lifted into place over an hour period by the constructionarium team. Ultimately this is what we had spent all week working towards whilst learning how a construction site works, the processes involved and the documentation along the way. We all sat up on the bank adjacent to the bridge site, watching as each key component was lifted into place as appropriately secured. I was first to cross the bridge and it was a brilliant feeling, walking across a 10m reinforced concrete suspension bridge that we had created together in a week.
  

The involvement of Shepherd gave us additional pools of experience to learn from, guidance and a chance to network. So many had never come into contact with members of the construction industry and I heard several comments from friends of "are all construction workers/engineers this nice or just Shepherd?" It really was a highly valuable and enjoyable experience which I would recommend to anyone, any project is such a useful insight just makes it even more special if it's a construction process you are so vested in. Massive thanks to Shepherd, Constructionarium and to those at Leeds 


1 comment:

  1. Thanks for sharing this experience Kit, it sounds really positive. I am undertaking an independent review of Constructionarium on behalf of CITB, and would welcome your feedback using the online link below. Any problems - I am on 01904 343891 or paul@skyblue.org.uk. Please feel free to pass on the link to any others who were at Bircham with you. There is a prize draw to win £100 for one person who takes part. Bes wishes Paul Rhodes, Skyblue