Friday, 3 July 2015

Actually building bridges (on Constructionarium)

One of the selling points of any university during the UCAS admissions process was always whether or not they took part in constructionarium, a field course providing students with hands on construction experience over a period of a week, their aim is to "turn theory into practice". Hence Leeds was a big contender, I was later thrilled to discover it was alongside a couple of reports counted as a 10 credit third year module, despite my acceptance to study abroad next year I still wanted to do constructionarium.

This year Leeds invited Shepherd Construction to join us, a contractor who recently completed the new Leeds University Laidlaw library alongside many other prominent projects in the North, they were asked to get involved in several roles; providing us with guidance, a client figure and more of a professional workplace scenario. 

Prior to departure for the fieldcourse we had two meetings with Shepherd; the first a workshop introducing Shepherd and the pre-site process that takes place followed by a later review session to assess how far we had come in terms of documentation such as method statements and risk assessments whilst also allowing us to meet and familiarise ourselves with the project manager allocated to each team by Shepherd. Having a Shepherd project manager per team gave us a "first point of call" and made us feel more at ease when making big decisions that would affect the project. 

Constructionarium itself is based at the CITB construction college at Bircham Newton in Norfolk (where the canteen food was another selling point as we'd previously visited CITB for a surveying course...) with a large construction site where scaled down versions of famous buildings and infrastructure can be reproduced. The 3 that Leeds University had opted to create this year were the Gherkin; 30 St Mary's Axe in London, Ravenspurn Oil Rig; an oil rig in the Humber estuary, and Brewery Wharf Bridge; a footbridge in Leeds. Obviously I wanted to be on the bridge project as this would be my first chance at constructing a real bridge not made from cake. This was the first year that project preferences could be stated and hence there was a good split and interest for all as each project had really interesting key elements. 

On the first evening we walked up to the site to look through the gate at the areas where we would be working alongside our site cabins, this was then followed by a first evening meeting where the format was explained and there was then time to print and sign off method statements and risk assessments for work to begin the next day. 

Within each of the 3 teams of 18 people each, we selected a role to carry out such as planner, site engineer, safety manager, quality assurance, setting out engineer, different foremen, power tool operators, each with a key role in the project, I was project manager and so was responsible for overseeing the project, ensuring things were running to schedule and delegating tasks efficiently and effectively within the team. This was such an enjoyable role as it was my first chance to actually lead a team and was able to liaise with the client ensuring that each of the tasks were carried out to a high standard by the team. If there were any issues or queries I was who they should go to for me to decide how to respond/ progress. 

There were a really good key set of people who were really enthusiastic and helpful in the pre - site sessions making sure that all of our documentation would be suitable, meaning work could start first thing on the Monday. 

Monday began with an 8am start on site which included a project managers huddle with members of shepherd to discuss materials, plant, concrete deliveries alongside runnings of the site. Relevant information was then relayed to the rest of the group in separate team huddles, discussing our plan of action for the day. These morning huddles were repeated each day to get an understanding of site structure and to organise deliveries to site alongside plant so that each group could be efficient as possible planning their timings including the crucial concrete deliveries - the main targets for the day. 

The bridge that we built was created out of 3 pre cast concrete elements; the a frame and 2 bridge decks that were all formed in our preparation / set down yard. The main tasks for Monday were to create two temporary timber platforms to later cast the pre cast elements on. Following this we made all of the form work for both the a frame and deck sections. 

A key milestone in the programme was a big pour of all of the pre cast elements on the second day, Tuesday of which the constructionarium guys expressed concern at, I was persistent and encouraged the team to get involved and we managed all of the rebar for one leg of the a frame in under an hour, this speed with precision continued for the rest of the day. I spent the first hour of the day running between different people convincing them that we could have our elements ready for a 3pm pour, something that is not normally done (usually just the a frame and big deck section are poured) to us it made sense all at once to ensure we achieved enough strength for lifting on Thursday / Friday. After much convincing the pour was allowed to go ahead with a very productive and tight day but the team were driven, we knew it had to get done. Once it was poured it was an immensely satisfying feeling as there was a rumour that this was the first time all 3 elements had been poured together. The team really pulled together and was a real demonstration of good teamwork.


Wednesday was meant to be the big day for foundations however once we'd learnt the timescales of how long it takes to make and secure form work alongside fixing rebar, the foundations were split over 2 days. The adapted schedule required an extra concrete pour which was scheduled with the Ravenspurn pour. Our foundations were huge masses of concrete with the far footing, foundation 3 requiring 7m3 of concrete plus a ground bearing slab. This foundation was poured on Thursday and required lots of extra propping and securing in terms of the timber form work. Apparently in the past this foundation had blown, which would have obviously been a major set back. 

Throughout the entire construction process lots of care and consideration was taken to consider health and safety aspects especially concerning nails in timber, which one group dully carried out. Shepherd introduced us to their "stop and go" cards that are used out on site used to flag up and praise site behaviour, this became a favourite of our H&S manager making safety more fun and everyone became more aware of it. This was heavily encouraged by Shepherd and was discussed as part of the evening meetings, near misses were also repeated and we were informed of anything that had occurred with other groups so we could avoid this. 

Friday was a key day as on our bridge site all that was visible were the 3 concrete foundations however on Friday the 3 precast elements were lifted into place over an hour period by the constructionarium team. Ultimately this is what we had spent all week working towards whilst learning how a construction site works, the processes involved and the documentation along the way. We all sat up on the bank adjacent to the bridge site, watching as each key component was lifted into place as appropriately secured. I was first to cross the bridge and it was a brilliant feeling, walking across a 10m reinforced concrete suspension bridge that we had created together in a week.
  

The involvement of Shepherd gave us additional pools of experience to learn from, guidance and a chance to network. So many had never come into contact with members of the construction industry and I heard several comments from friends of "are all construction workers/engineers this nice or just Shepherd?" It really was a highly valuable and enjoyable experience which I would recommend to anyone, any project is such a useful insight just makes it even more special if it's a construction process you are so vested in. Massive thanks to Shepherd, Constructionarium and to those at Leeds 


Thursday, 2 July 2015

To be continued...

Sooooo I've kind of neglected this for 5 months now, this is just a brief comment to say that I am well aware and there is a post being written about constructionarium that took place 3 weeks ago, plus internship diaries and there'll be some posts about Canada when I begin my year abroad at the end of the August!

Second year has been incredibly hectic and all over the place but it's over with results looming, but it's been a good design and organisational experience especially in terms of the Integrated Design Project; the design of a 5 storey office building in both steel and concrete followed by a complete design review report. Alongside other trips, coursework and organising for CivSoc and RAG

To be continued...

Monday, 9 February 2015

General ramblings and musings of 2nd year

As stated in the previous post I feel as though I've neglected my blogging duties for the past few months - blame the first term of the second year of a university degree... I was warned... 

Semester one started off with lots of responsibilities to manage and arrange ; civsoc, volunteering stuff, uni work and preparation and beginning to apply for internships/placements for summer 2015.

Applying for internships back in September may seem as incredibly keen but having been through the process last year I know that a lot of positions are on a first come first served basis in terms of securing an interview, despite there being an application deadline... Obviously a company's main student recruitment focus is for a new influx on graduates however applying early for placements shows commitment and dedication. Also many actual deadlines were the 31st of January which is pretty soon after exams so getting things sorted early on pays off (this may be late for any student engineers reading this... But there are still some positions that haven't formally closed...)  
Saying this the majority close by the 31st of March unless they have a rolling application process...

Once the application is done you just have to wait and see.. Make sure to keep a track of where, when and how you've applied (online app/email/letter) and to save all answers from application forms and the associated covering letter etc should you be invited for interview you will be asked about what you've previously written...

The best forms of application are simply a cv & covering letter followed by an interview however for the big popular engineering companies extra screening is required... Those dreaded tests!! There are practices but it's just familiarising yourself with a proper test; maybe even "sacrificing" a test...

I personally don't find interviews too bad... It's just another way for you to talk about your passion ; for me to ramble about my love for engineering... It's good I note down a couple of scenarios where you've used team work, shown leadership and had to overcome a problem - you should have a couple of examples for each that you feel comfortable talking about...

Ultimately be yourself and if the company want you then great! If not there are plenty more - there will be something and speaking from experience I've had many many rejections along the way... 

Good luck if you are applying/interviewin or simply in life...

Also I don't really know who reads this hence how useful it is...

I'll bake again soon those posts are better 

Sunday, 25 January 2015

Baking... Buildings...?

So, exams finally finished on Thursday (blog to come re: stress, exams & internships...) and following a night out my friend and I decided that the perfect way to celebrate was to bake a university building...

Not quite baking bridges but still an engineering themed bake. If it was solely my choice I would opt for my most favoured Leeds university, the ziff after a disastrous architecture project... However we selected the iconic Leeds University Parkinson steps where that famous graduation photo takes place. 



We opted for a series of layers of vanilla & chocolate sponge allowing us to make a simplified version of those steps it only two two trays of cake - one vanilla and one chocolate and 2 messy hours of baking and assembly to come together. Featuring a buttercream façade and chocolate button windows we present the Parkinson building! 

 
Once again sorry for the ramblings as per usual and I need to get into writing more regularly again, lots of upcoming fun engineering things alongside an update re exams, interviews, year abroads and student to stemette, which I have been incredibly bad at due to the hectic last few weeks of 2014 & that exam season

Monday, 13 October 2014

Chaos, whirlwinds and my attempt at tying it all back down...

Finally being back in the uni bubble, whirlwind and general chaos of life I haven't had time for a blog post. I really should set myself some blog time, but I guess I'll just add it to the never-ending list...

Technically this is only my 3rd week back at uni but having been in every day of freshers planning for the Civil Engineering Society, meeting the freshers, encouraging sign-ups alongside meeting the other hitch leaders for the Leeds RAG Hitch to Morocco, that week didn't have the relaxed care-free days and the hectic nights that are so stereotypically associated with university freshers weeks no matter what year of university you are returning to...

Being the beginning of the year I fully expected to be busy especially with my additional commitments but it's easy to forget how much time it takes to draft a work timetable, organising your room (& an accompanying filing system) not forgetting how long it can take to cook after a long day of learning. I know I should be well-prepared for this after a summer placement but my hours with YW were much more forgiving and in my opinion learning and lectures are much more draining...

Anyway hopefully after my meticulous planning it should all get much easier and things are starting to fall back into place as we all get back into the uni routine. Sleep, uni, work, eat, sleep repeat with the occasional night out spaced in between haha!!

Sanctity has once again been found in the penultimate and final bake off episodes alongside some baking of my own (Strawberry Cheesecake for a housemate's birthday and butterfly cakes...). Can I just say that I was gutted that Richard did not win GBBO especially after his record-breaking no. of times as star baker (five?! FIVE?!) but Nancy was a very deserved winner especially with her Moulin-Rouge inspired windmill piedmontese(?) I was surprised there were not more comments from the judges/Mel & Sue RE: the sheer and silly number of showstoppers involving windmills...?!?
All I can say is that I am glad that Luis did not win as at times there was a look in his eye that came across as sinister or maybe it is controversial editing by the BBC (Iain m.II)

Anywayy onto another week... A proper engineering post will be coming soon about internships, careers fairs and the never ending re-working and adjustments to the cv...

Thursday, 25 September 2014

My time at Yorkshire Water

As any civil engineering student, or students in general, summer placements and work experience are key to securing that ever-looming 'dream job' having thought I had lost out this year to more knowledgeable 2nd year and above students (companies normally opt for older students for their technical expertise and so that they can actually do engineering design calcs, as well as gain the more necessary experience) I was offered an internship with Yorkshire Water for 8 weeks (excluding my 2-3 week break for Forest School Camps and a couple of days at home). Based within the planning and asset management team, I was looking at the existing service reservoirs, planning out what works were required for the next asset management plan (AMP6), this was all input into a database, relying on both organisational and processing skills. 

Alongside my main role, I was able to go on day placements shadowing other engineers, technicians and managers within the company including days with both the leakage and field tech teams, technical operations; installing onsite pressure loggers, spending a day in the control room, touring 2 of the waste water treatment works and one clean water treatment works, visiting several service reservoirs and spending a few days with YWs contract engineering partners MMB (Mott MacDonald Bentley); working through calcs, going out on site and assisting with general enquires.


The site visit with MMB to Baitings Bridge was explained in the previous blog post - bridging a vast amount of water but following on from this I was able to look back through calculations and understand the site queries that were resolved back in the office. I also got given calculations for one of the new service reservoirs, that had been included in my database review, hence linking everything together... These calcs were for sliding checks if one compartment of a service reservoir was removed would the wall slide out and fail without the support of the existing second compartment... I may not have actually done the calc myself but I re-worked my way through it, highlighting the geotechnics basics that I had learnt from my first year, which I assumed were pretty basic... however these are the principles that civil engineering builds upon - so you heard it hear first (well not first but from experience) that first year definitely does count!! 

As part of my documentation process I wrote a series of weekly summaries for my time at Yorkshire Water like a diary totalling 14 pages! There was an unsurprisingly lengthy description for every new task or placement that I did, highlighting the key tasks, what I enjoyed and how it fitted into the rest of the company alongside my set work and the network asset planning team that I was part of. I intend to use these summaries as an aide-memoir for speaking about my placement to other Civils students, at interviews and in conversation about what I have learnt about the water industry that we, as the public know very little about...

Generally I really enjoyed my time at Yorkshire Water, having enjoyed my Water Engineering modules it made sense to pursue the water industry, gaining a more in depth understanding of the different systems and networks in place, how clean and waste operate completely separately and how in the treatment process, waste water treatment relies solely on 'good bacteria' and air to cleanse and treat the water before it is put back into the river. Seeing the engineering designers both on site and in the office has helped me to link the whole process back to my degree in terms of calculations, site management and environmental awareness, building upon the knowledge of my Civil and Structural Engineering degree. For those in science, engineering or environment I thoroughly recommend looking into and researching a water company as water is a necessity and a basic human right, alongside sanitation, you are providing a service and without the job there would be more hazardous and dangerous situations. The water industry is something that I will now consider as a potential future career, however I cannot decide this until I have experience more time both on site with a contractor and in a design office looking more at buildings hopefully gaining the chance to specialise in bridges....

I'd just like to thank Yorkshire Water for taking me on as an intern especially David Owen who sits on the Leeds Industrial Panel, hence the link and the Network Asset Planning Team especially Ronnie, Pete, Dave and Simon - thanks!!

In other news there was a really great student to STEMette webinar this week about building up an online profile, I've been matched, I've officially got a mentor - exciting times ahead!! aaaanddd I've been spending a lot of time back in CivEng, as being freshers week the committee have been in signing up enthusiastic new members :)

Tuesday, 16 September 2014

Bridging a vast amount of water

I am sure that whoever out there that is reading is well aware, that I love bridges. It's fine though as I want to be a civil/structural engineer and it is one of our major associations. Bridges. So you can imagine how pleased I was to get to go to my second bridge site visit (!)

This site visit was on Monday to a bridge that crosses an impounding reservoirs, both owned by Yorkshire Water, who I have spend a summer internship with (there will be a post summarising my 8-week summer placement). As part of my time with YW, I have been rotating around spending a day or two with different teams and departments within the company (not going to get into toooo much detail about this now) but basically for the past 2 days I have been working in the central Leeds office, where YWs contract partners (summarising term for engineers) MMB - a joint venture between Mott MacDonald and Bentley are based. Obviously when I was told that I was going to a bridge site visit I had to stifle some of my enthusiasm (didn't want to come across as too keen on the first day...) but all site visits are interesting, insightful and incredibly exciting as you are seeing something on paper (whether you designed/drew it or not) turned into life (apologies - how incredibly cliché of me :/)

Baitings Bridge is a concrete road bridge that spans the width of Baitings Impounding Reservoir (where raw water from the nearby hills/rivers etc is stored before it is treated) nr. Rochdale/Huddersfield. The reservoir itself was adjacent to the route of le tour (as were many of YWs other assets) and due to the state of the bridge had to be closed off to prevent the public gaining access.. The bridge is undergoing major remedial works due to noticeable cracking in the deck and walls. This has all been stripped off, leaving just the abutments (end sections) and the piers (middle pieces that break up the spans). The abutments and piers have since been hydro-demmed (hydro-demolition which basically pressure-washes off all of the old, crumbling concrete that had cracked) therefore re-exposing the existing steel rebar below. Despite the piers being in the middle of a reservoir we were able to walk around each pier inspecting the hydro-demmed work and the condition of the exposed bars, due to a floating deck or pontoon which had been installed giving access for engineers, general contractors and the specialists. For the full inspection prior to the bridge being stripped divers had gone into the IRE to look at the condition of the pier bases and see if there was any major remedial works to be done below water level...

The reason for the site visit was a general progress meeting held by ARUP who were acting on behalf of Yorkshire Water to ensure the works by MMB were up to their spec, it was interesting to see two civils companies (taking MMB as one unit) working collaboratively towards the same aim, despite acting for different people. Whilst touring the site, it was noticed that as the bars have now been exposed their is notable pitted corrosion on the steel, potentially due to a chlorides attack from the older cement mix, which needed reactive works. For me it was insightful to see the reaction to the findings and how this was steadily progressed and discussed both on site and upon our return to the office. A decision has now been made about how they will progress with the on site works which both remedies the corrosion that has already occurred and should prevent further chloride attack....