I am sure that whoever out there that is reading is well aware, that I love bridges. It's fine though as I want to be a civil/structural engineer and it is one of our major associations. Bridges. So you can imagine how pleased I was to get to go to my second bridge site visit (!)
This site visit was on Monday to a bridge that crosses an impounding reservoirs, both owned by Yorkshire Water, who I have spend a summer internship with (there will be a post summarising my 8-week summer placement). As part of my time with YW, I have been rotating around spending a day or two with different teams and departments within the company (not going to get into toooo much detail about this now) but basically for the past 2 days I have been working in the central Leeds office, where YWs contract partners (summarising term for engineers) MMB - a joint venture between Mott MacDonald and Bentley are based. Obviously when I was told that I was going to a bridge site visit I had to stifle some of my enthusiasm (didn't want to come across as too keen on the first day...) but all site visits are interesting, insightful and incredibly exciting as you are seeing something on paper (whether you designed/drew it or not) turned into life (apologies - how incredibly cliché of me :/)
Baitings Bridge is a concrete road bridge that spans the width of Baitings Impounding Reservoir (where raw water from the nearby hills/rivers etc is stored before it is treated) nr. Rochdale/Huddersfield. The reservoir itself was adjacent to the route of le tour (as were many of YWs other assets) and due to the state of the bridge had to be closed off to prevent the public gaining access.. The bridge is undergoing major remedial works due to noticeable cracking in the deck and walls. This has all been stripped off, leaving just the abutments (end sections) and the piers (middle pieces that break up the spans). The abutments and piers have since been hydro-demmed (hydro-demolition which basically pressure-washes off all of the old, crumbling concrete that had cracked) therefore re-exposing the existing steel rebar below. Despite the piers being in the middle of a reservoir we were able to walk around each pier inspecting the hydro-demmed work and the condition of the exposed bars, due to a floating deck or pontoon which had been installed giving access for engineers, general contractors and the specialists. For the full inspection prior to the bridge being stripped divers had gone into the IRE to look at the condition of the pier bases and see if there was any major remedial works to be done below water level...
The reason for the site visit was a general progress meeting held by ARUP who were acting on behalf of Yorkshire Water to ensure the works by MMB were up to their spec, it was interesting to see two civils companies (taking MMB as one unit) working collaboratively towards the same aim, despite acting for different people. Whilst touring the site, it was noticed that as the bars have now been exposed their is notable pitted corrosion on the steel, potentially due to a chlorides attack from the older cement mix, which needed reactive works. For me it was insightful to see the reaction to the findings and how this was steadily progressed and discussed both on site and upon our return to the office. A decision has now been made about how they will progress with the on site works which both remedies the corrosion that has already occurred and should prevent further chloride attack....



No comments:
Post a Comment