My time at Yorkshire Water

As any civil engineering student, or students in general, summer placements and work experience are key to securing that ever-looming 'dream job' having thought I had lost out this year to more knowledgeable 2nd year and above students (companies normally opt for older students for their technical expertise and so that they can actually do engineering design calcs, as well as gain the more necessary experience) I was offered an internship with Yorkshire Water for 8 weeks (excluding my 2-3 week break for Forest School Camps and a couple of days at home). Based within the planning and asset management team, I was looking at the existing service reservoirs, planning out what works were required for the next asset management plan (AMP6), this was all input into a database, relying on both organisational and processing skills. 

Alongside my main role, I was able to go on day placements shadowing other engineers, technicians and managers within the company including days with both the leakage and field tech teams, technical operations; installing onsite pressure loggers, spending a day in the control room, touring 2 of the waste water treatment works and one clean water treatment works, visiting several service reservoirs and spending a few days with YWs contract engineering partners MMB (Mott MacDonald Bentley); working through calcs, going out on site and assisting with general enquires.


The site visit with MMB to Baitings Bridge was explained in the previous blog post - bridging a vast amount of water but following on from this I was able to look back through calculations and understand the site queries that were resolved back in the office. I also got given calculations for one of the new service reservoirs, that had been included in my database review, hence linking everything together... These calcs were for sliding checks if one compartment of a service reservoir was removed would the wall slide out and fail without the support of the existing second compartment... I may not have actually done the calc myself but I re-worked my way through it, highlighting the geotechnics basics that I had learnt from my first year, which I assumed were pretty basic... however these are the principles that civil engineering builds upon - so you heard it hear first (well not first but from experience) that first year definitely does count!! 

As part of my documentation process I wrote a series of weekly summaries for my time at Yorkshire Water like a diary totalling 14 pages! There was an unsurprisingly lengthy description for every new task or placement that I did, highlighting the key tasks, what I enjoyed and how it fitted into the rest of the company alongside my set work and the network asset planning team that I was part of. I intend to use these summaries as an aide-memoir for speaking about my placement to other Civils students, at interviews and in conversation about what I have learnt about the water industry that we, as the public know very little about...

Generally I really enjoyed my time at Yorkshire Water, having enjoyed my Water Engineering modules it made sense to pursue the water industry, gaining a more in depth understanding of the different systems and networks in place, how clean and waste operate completely separately and how in the treatment process, waste water treatment relies solely on 'good bacteria' and air to cleanse and treat the water before it is put back into the river. Seeing the engineering designers both on site and in the office has helped me to link the whole process back to my degree in terms of calculations, site management and environmental awareness, building upon the knowledge of my Civil and Structural Engineering degree. For those in science, engineering or environment I thoroughly recommend looking into and researching a water company as water is a necessity and a basic human right, alongside sanitation, you are providing a service and without the job there would be more hazardous and dangerous situations. The water industry is something that I will now consider as a potential future career, however I cannot decide this until I have experience more time both on site with a contractor and in a design office looking more at buildings hopefully gaining the chance to specialise in bridges....

I'd just like to thank Yorkshire Water for taking me on as an intern especially David Owen who sits on the Leeds Industrial Panel, hence the link and the Network Asset Planning Team especially Ronnie, Pete, Dave and Simon - thanks!!

In other news there was a really great student to STEMette webinar this week about building up an online profile, I've been matched, I've officially got a mentor - exciting times ahead!! aaaanddd I've been spending a lot of time back in CivEng, as being freshers week the committee have been in signing up enthusiastic new members :)

Tuesday, 16 September 2014

Bridging a vast amount of water

I am sure that whoever out there that is reading is well aware, that I love bridges. It's fine though as I want to be a civil/structural engineer and it is one of our major associations. Bridges. So you can imagine how pleased I was to get to go to my second bridge site visit (!)

This site visit was on Monday to a bridge that crosses an impounding reservoirs, both owned by Yorkshire Water, who I have spend a summer internship with (there will be a post summarising my 8-week summer placement). As part of my time with YW, I have been rotating around spending a day or two with different teams and departments within the company (not going to get into toooo much detail about this now) but basically for the past 2 days I have been working in the central Leeds office, where YWs contract partners (summarising term for engineers) MMB - a joint venture between Mott MacDonald and Bentley are based. Obviously when I was told that I was going to a bridge site visit I had to stifle some of my enthusiasm (didn't want to come across as too keen on the first day...) but all site visits are interesting, insightful and incredibly exciting as you are seeing something on paper (whether you designed/drew it or not) turned into life (apologies - how incredibly cliché of me :/)

Baitings Bridge is a concrete road bridge that spans the width of Baitings Impounding Reservoir (where raw water from the nearby hills/rivers etc is stored before it is treated) nr. Rochdale/Huddersfield. The reservoir itself was adjacent to the route of le tour (as were many of YWs other assets) and due to the state of the bridge had to be closed off to prevent the public gaining access.. The bridge is undergoing major remedial works due to noticeable cracking in the deck and walls. This has all been stripped off, leaving just the abutments (end sections) and the piers (middle pieces that break up the spans). The abutments and piers have since been hydro-demmed (hydro-demolition which basically pressure-washes off all of the old, crumbling concrete that had cracked) therefore re-exposing the existing steel rebar below. Despite the piers being in the middle of a reservoir we were able to walk around each pier inspecting the hydro-demmed work and the condition of the exposed bars, due to a floating deck or pontoon which had been installed giving access for engineers, general contractors and the specialists. For the full inspection prior to the bridge being stripped divers had gone into the IRE to look at the condition of the pier bases and see if there was any major remedial works to be done below water level...

The reason for the site visit was a general progress meeting held by ARUP who were acting on behalf of Yorkshire Water to ensure the works by MMB were up to their spec, it was interesting to see two civils companies (taking MMB as one unit) working collaboratively towards the same aim, despite acting for different people. Whilst touring the site, it was noticed that as the bars have now been exposed their is notable pitted corrosion on the steel, potentially due to a chlorides attack from the older cement mix, which needed reactive works. For me it was insightful to see the reaction to the findings and how this was steadily progressed and discussed both on site and upon our return to the office. A decision has now been made about how they will progress with the on site works which both remedies the corrosion that has already occurred and should prevent further chloride attack....




Saturday, 6 September 2014

On a train = new blog post & bake off update...

Sooo there's becoming a trend as to when I write a new post, I like to think of it as multitasking... It seems as though a train journey (without internet) results in me writing up the latest musings of my rambling brain... Although don't expect this to become the norm as over the next 3 days I'm going on 6 different trains - busy busy!! 

Soooo as I am finally up to date with Bake Off I thought it was time for a post... Firstly despite whatever controversy there was or wasn't surrounding that baked Alaska, I would just like to state that I am gutted that Iain the rugged Irish construction engineer has left the bake off, he was truly a good baker and desserts week had generally been a good week for him until the fiasco for which ultimately the weather is to blame... Not Diana (although she did initially remove the Alaska...) and some may blame the producers but seriously cooking/baking/freezing anything involving ice-cream on the hottest day of the year in a tent is simply ludicrous... That's all I have to say on the matter- goodbye Iain!!! 

I thoroughly enjoyed both biscuit week (mainly for the construction task...) and pies & tarts week as I love a good lemon meringue pie (of which the closest thing was a tarte au citron by Norman...) and I am shocking with pies so it's always an interesting watch... I was very pleased to see Kate recognised for her hard work as she has been soon well for weeks but has been somewhat overshadowed by Richard (kudos for being star baker twice already!!!) and Nancy but this was definitely her week, she remained calm and collected and seemed to breeze through the tasks, she even had time to help Martha remove her pie from the case!  It was nice to be able to watch this  weeks with 2 of my housemates on Iplayer and it's more fun with other people gauging who likes who best & reactions to baking successes and failures... 

Next weeks theme returns to something that is more within my realm of baking - European cakes - from languages club I haveade madeleines and experimented with some other European recipes so should be a good week!! 

I intended to get round to baking brownies this week as I've got a spare bar of bournville in the cupboard but I've been to busy with work (many many site visits and long days) and then still trying to recover some sleep from camp prior to this weekend - flatmates followed by my 21st hence all the trains... 

I do really need to bake something civil engineering related ASAP but there is something in the pipeline...